CASE STUDY: SWANSEA BAY WWTW VENTILATION SCHEME

CASE STUDY: SWANSEA BAY WWTW VENTILATION SCHEME VIEW FULL CASE STUDY

Case study: Pen-y-Bont Blowers WwTW

Case study: Pen-y-Bont Blowers WwTW VIEW FULL CASE STUDY

CASE STUDY: ACIEM PROVIDES LOLER SUPPORT FOR YORKSHIRE WATER

CASE STUDY: ACIEM PROVIDES LOLER SUPPORT FOR YORKSHIRE WATER

ACIEM have, to-date, replaced approximately 530 chains and shackles, varying from 500kg to 11 tonnes, for LOLER projects LOLER Year1, Year2 and undertaken emergency works. Over the past 12 months the business has learnt, adapted, innovated and changed the way we work. We have a number of specialist full time gangs and have invested in specialist equipment which will enable us to complete 85% of chains on our first visit. VIEW FULL CASE STUDY

Wessex Water Site Security

ACIEM has programme and project-managed works to enable Wessex Water to meet its security obligations throughout the AMP3 and AMP4 periods and is doing so currently in AMP5. VIEW FULL CASE STUDY

Warminster STW

ACIEM has undertaken the civil engineering enabling works to facilitate a new waste water ferric dosing treatment system at Warminster STW. VIEW FULL CASE STUDY

Sutton Bingham Water Treatment Works

This project involved significant works to future proof the plant in order to cater for flows generated by an increasing holiday population and to enable complete remote monitoring and control of the VIEW FULL CASE STUDY

Reservoir Repair And Security

In 2007, ACIEM (as Damar Group Ltd) was awarded the two year framework agreement to undertake repairs and carry out security works to reservoirs across the Wessex Water region. VIEW FULL CASE STUDY

Pumping Station Refurbishments

Wessex Water recognised the necessity to initiate a programme of works to refurbish a number of critical pumping stations based along a part of the South Coast, stations that form a network that pump VIEW FULL CASE STUDY

Princes Risborough STW

The town of Princes Risborough had been identified as a potential growth area in terms of additional housing and therefore the town's sewage treatment plant would need modification to facilitate addi VIEW FULL CASE STUDY

Poole Sewage Treatment Works

The existing sewage treatment works at Poole incorporated a Biofor Treatment Plant, containing 8no Stage One treatment cells and 18no Stage Two treatment cells which has to be removed, cleaned and re VIEW FULL CASE STUDY

Oxford STW

ACIEM worked on this Aecom/Kier joint venture where Thames Water utilised the bio-solids produced by its sewage treatment operations. VIEW FULL CASE STUDY

Little Marlow STW

The design and construction of an odour control unit for Little Marlow Seawage Treatment Works
VIEW FULL CASE STUDY

Huntercombe STW

Prior to adoption Huntercombe STW required significant upgrades to meet operational and regulatory requirements. VIEW FULL CASE STUDY

Frome Water Treatment Works

Construction of a reinforced concrete pumping station within an existing operational Water Treatment Works operated by Bristol Water VIEW FULL CASE STUDY

Fobney WTW

ACIEM undertook the design, construction and commissioning of a resilience and reliability upgrade encompassing the entire low voltage installation of Fobney Water Treatment Works. VIEW FULL CASE STUDY

Farmoor Valves

ACIEM completed the replacement of seven contact tank valves from 750mm to 1200mm in size and a number of flowmetres at various points in the process. VIEW FULL CASE STUDY

Cropredy STW

Thames Water engaged ACIEM to upgrade the serviceability of Cropredy STW VIEW FULL CASE STUDY

Avonmouth Food Waste Treatment Works

The works included the construction of a new build Food Waste Treatment Plant in Avonmouth VIEW FULL CASE STUDY

Avonmouth Acid Phase Digestion Plant

ACIEM was engaged to replace five ageing dry well pumps – Motor 1100kgs and Pump 2300kgs, with 90 kW ratings; gate valves, pressure transducers and pump monitors.  VIEW FULL CASE STUDY

Appleton STW

Thames Water engaged ACIEM to build two new Humus Tanks and modify the existing chambers and pipework to accommodate the new Humus Tanks. VIEW FULL CASE STUDY

AMP5 Capital Framework and Reservoir Repairs

Working closely with Wessex Water as a framework contractor we are delivering a programme of works throughout the AMP5 period. VIEW FULL CASE STUDY