Warminster STW

Title

Warminster STW

Client

Kelda Water

Value

£55,000.00

Type of work

Civil and Mechanical Engineering

Description

ACIEM has undertaken the civil engineering enabling works to facilitate a new waste water ferric dosing treatment system at Warminster STW. Based on these upgrades the STW will achieve discharge consent compliance.

PROJECT HIGHLIGHTS

Working to a short deadline ACIEM overlapped elements of the programme to ensure the project was complete prior to chemical plant delivery

We installed single and multi-way 100mm nominal bore ducting including risers; building & chamber entries; associated duct chambers and the base slab for the ferric storage tank, dosing kiosk and emergency shower

ACIEM reinstated all soft landscape areas disturbed by the works

The project team worked within the constraints of the site including coordinating with the activity of the live firing range on site

The site falls within or adjacent to two Sites of Special Scientific Interest (SSSI), a Special Protection Area (SPA), a Special Area for Conservation (SAC). There are 12 Scheduled Monuments within the area. The project team used Damar Group’s Environmental Management Plan to identify these environmental considerations and appropriate action where required